The LCM Team decommissioned and removed 2 existing ducted systems and replaced them with 3 new commercial Temperzone ducted systems into an office in Fortitude Valley.
The outdoor units were crane lifted onto the roof at 4am in the morning to avoid traffic, and the decommissioned outdoor units were lifted down at the same time. We worked intensely over 3 days to get the systems up and running and therefore minimise the disruption to the customer’s operations.